Safe Work Method Statements (SWMS)
Since 2009 we have been developing Safe Work Method Statements for clients in the construction industry.
The SWMS incorporate the most current WHS information / legislation and codes of practice.
Each SWMS we develop for our clients are individual, directly relating to the clients business needs and requirements with the tasks carried out.
This then forms the master group of SWMS.
This process is what makes us unique within our field.
Site Specific
Site Specific documents are based on the scope of the job and any additional information, this often includes plans, specifications etc. or any specific requests from the Principle Contractor such as attending their Induction, access to site, loading areas etc.
We start with your current master documents / SWMS and then build on these to make them site specific.

















